Media
Video


Knob Hill Wind Farm
(120 Mb)
mpg


Juan de Fuca Cable
(48.1Mb)
mpg

Brochure
Knob Hill Wind Farm
Juan de Fuca Cable


West Coast Cable
Cascade Heritage Power Project
The Sea Breeze Advantage

• Sea Breeze is a leader in the rapidly emerging green energy industry; our portfolio of generation and transmission assets leverages the growing clean energy markets along the North American West Coast.

• British Columbia is recognized as having a vast potential for wind energy and run-of-river hydroelectricity development. Sea Breeze has projects covering 180,000 hectares including some of the most desirable sites in BC. We have already obtained environmental approvals for a 100 MW wind project and a 25 MW hydroelectric project, which represent significant achievements in the development of our projects.

• Sea Breeze’s 100 MW Knob Hill wind farm on Vancouver Island was the first wind farm in BC to receive an Environmental Assessment Certificate. We have collected wind speed data for more than 5 years at the site. A minimum of 1 year is needed for assessing the potential of a wind farm site.

• The Juan de Fuca Cable is a 550 MW electricity transmission project that has been approved by both Canadian and US Federal authorities. It utilizes state-of-the-art High Voltage Direct Current (“HVDC”) Light® technology. Unlike traditional AC lines, HVDC Light® cable can be easily buried underground, has no fluctuating EMFs and bears a low environmental impact. This project would create a critical link between the growing markets for renewable energy along the West Coast and BC’s abundant green power potential. 

• Sea Breeze has developed substantial in-house capabilities in meteorology, project siting and project permitting. We have experienced, qualified and committed members on our Board and our team are both passionate and committed to affecting positive environmental changes through our operations.

Yes, I would like to be added to the Sea Breeze mailing list for upcoming news releases!
First-Name:
Last-Name:
E-Mail:
I would like an investor Package sent to me at:
Address*:
Town/City*:
Prov/State*:
Postal Code*:
Country:
Questions or Comments:

Latest News
Apr 07/09
$3.7 MILLION CONVERTIBLE DEBENTURE
Nov 27/08
Sea Breeze Bids Cascade Project into BC Clean Power Call
Nov 26/08
Knob Hill Wind Farm Bid into BC Hydro Power Call
Oct 03/08
Juan de Fuca Cable – Final US Permits Issued
Jun 26/08
SEA BREEZE CLOSES $2.5M CONVERTIBLE DEBENTURES
Jun 16/08
SEA BREEZE NEGOTIATES TERMS ON $2.5M CONVERTIBLE DEBENTURE
Jun 12/08
Juan de Fuca Cable – Presidential Permit Issued by U.S. Department of Energy

Go to News Releases
Search News
Sea Breeze Power Corp. Copyright@2008