Media
Video


Knob Hill (121 Mb)
mpg


Juan de
Fuca
Cable
(48.1Mb)
mpg

Brochure
Knob Hill Wind
Farm
Juan de Fuca
Cable
Knob Hill Wind
Farm
West Coast Cable
Cascade Heritage Power
Project
Lorem ipsum dolor sit amet, consectetuer adipiscing

Lorem ipsum dolor sit amet

Consectetuer adipiscing elit,

  • sed diam nonummy nibh euismod tincidunt ut
  • laoreet dolore magna aliquam erat volutpat.
  • Ut wisi enim ad minim veniam, quis nostrud exerci tation

ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo consequat.

  • Duis autem vel eum iriure dolor in hendrerit
  • in vulputate velit esse molestie consequat,
  • vel illum dolore eu feugiat nulla facilisis at vero eros
  • et accumsan et iusto odio dignissim qui blandit praesent

luptatum zzril delenit augue duis dolore te feugait nulla facilisi.

Latest News
Oct 03/08
Juan de Fuca Cable – Final US Permits Issued
Jun 26/08
SEA BREEZE CLOSES $2.5M CONVERTIBLE DEBENTURES
Jun 16/08
SEA BREEZE NEGOTIATES TERMS ON $2.5M CONVERTIBLE DEBENTURE
Jun 12/08
Juan de Fuca Cable – Presidential Permit Issued by U.S. Department of Energy
May 07/08
Juan de Fuca Cable – BCTC Transmission Impact and Facility Studies Begin
Feb 25/08
3,578,542 Stock Options Granted
Jan 15/08
CASCADE HYDROELECTRIC PROJECT UPDATE

Go to News Releases
Search News
Sea Breeze Power Corp. Copyright@2008